Prime Minister Narendra Modi will inaugurate and lay the foundation stone of Pune Metro

Prime Minister Narendra Modi will inaugurate and lay the foundation stone of Pune Metro

He will also address the gathering on the occasion. Prime Minister Narendra Modi will inaugurate and lay the foundation stone of Pune Metro projects worth around Rs 21,800 crore on November 3, at 12:30 PM through video conferencing.

The project represents an important step towards strengthening Pune’s urban mobility infrastructure through technological innovation and modern transportation solutions. The corridor will provide Metro connectivity between the Hinjewadi IT hub and Shivajinagar, improving access to one of Pune’s major employment centres and facilitating the daily commute of thousands of IT professionals and other commuters. The corridor will integrate with the existing metro network, providing seamless connectivity across different parts of Pune. It will help reduce dependence on private vehicles, ease traffic congestion and vehicular emissions, and improve access to major commercial and residential areas. A notable feature of the Pink Line is its emphasis on women’s empowerment and gender-inclusive public transportation. The line will be operated entirely by women train operators, making it a first-of-its-kind initiative. Line 2A will connect Vanaz to Chandani Chowk, while Line 2B will connect Ramwadi to Vitthalwadi, extending the existing east-west Metro network. The release further stated that the new Metro corridors will connect several important locations, including Kharadi, Magarpatta, Hadapsar, Swargate, Manik Baug, Nanded City, Pune Cantonment and Warje. The eastern extension from Ramwadi to Vitthalwadi will improve connectivity to rapidly developing residential, commercial and IT hubs in Kharadi and Wagholi. The corridors will integrate with intercity bus services and the existing Pune Metro network through interchange facilities at Swargate, Nal Stop and Kharadi Bypass, facilitating seamless connectivity across different parts of the city. These projects will strengthen Pune’s public transportation infrastructure, improve connectivity across the city and provide commuters with an efficient and integrated urban mobility network. (Except for the headline, this story has not been edited by NDTV staff and is published from a syndicated feed.)

The PM will inaugurate Pune Metro Line 3, also known as the Pink Line, built at a cost of over Rs 8,300 crore, according to the Prime Minister’s Office. Spanning approximately 23 kilometres, the Pink Line connects Maan to District Court Metro station. The project also emphasises environmental sustainability, with approximately 30% of its total electricity requirements envisaged to be met through solar power. Prime Minister will also lay the foundation stone of Phase-II of Pune Metro, to be developed at an estimated cost of around Rs 13,500 crore. Phase-II comprises Pune Metro Lines 2A, 2B, 4 and 4A, which will substantially expand the city’s Metro network and strengthen connectivity across important residential, commercial and IT hubs. Under Phase-II, Lines 2A and 2B will span a total length of around 12.75 kilometres. Line 4, spanning around 25.52 kilometres, will connect Kharadi to Khadakwasla. Line 4A, spanning 6.12 kilometres, will connect Nal Stop to Manik Baug.